Property Renovation

A property renovation can cover a single room or the whole house, from new layouts and finishes to repairs and upgrades. We work out the scope with you on site, then plan the work in a sensible order so each trade can follow the last.

What's included

  • Demolition and strip-out of the areas being renovated
  • Framing changes, wall sheeting, and repairs to floors and ceilings
  • Plumbing and electrical work, carried out by licensed tradespeople
  • Kitchens, bathrooms and laundries
  • Tiling, flooring and joinery
  • Painting inside and out
  • Clean-up and removal of building waste

How the job runs

  1. Site visit

    We look at the job with you, talk through what you want, and take measurements. We also note anything that affects the scope, such as the age of the house and the condition of walls, floors and roof.

  2. Written quote

    You receive a written quote that sets out the scope of work, what is and isn’t included, and any allowances for items you are still choosing.

  3. Approvals, if needed

    Depending on the work, it may be exempt development, need a complying development certificate, or need a development application. A BASIX certificate may also be needed. This should be confirmed before any work starts.

  4. The work

    Strip-out, then structural and framing work, plumbing and electrical rough-in, and finishes such as tiling, joinery, flooring and painting, in the order agreed at the quote stage.

  5. Final walkthrough

    We go through the finished work with you and note anything that needs attention.

Standards & regulations

Renovation work in NSW should meet the National Construction Code (NCC) and NSW planning rules. Relevant standards and rules include:

National Construction Code (NCC)
Sets the minimum requirements for the design and construction of buildings in Australia.
Planning approval in NSW
Some minor work is exempt development and needs no planning or building approval, but only if it meets every standard in the NSW codes. Work that meets all the complying development standards can be approved with a complying development certificate from your council or a registered certifier. Anything else needs a development application to council.
BASIX
In NSW, a BASIX certificate is needed for alterations and additions to a home that cost $50,000 or more, and for pools or spas with a total volume over 40,000 litres.
Asbestos in older homes
SafeWork NSW advises that any house built or renovated before 1990 could contain asbestos, for example in roofing, eaves, fencing and flooring underlay. Suspect materials should be tested before work starts, and SafeWork NSW recommends using a licensed asbestos removalist.
Lead paint and dust
NSW Government guidance says lead paint was used in most homes built in Australia before 1970, and that lead dust can build up in roof spaces, behind walls and under floorboards. Old paint and dust should be handled with lead-safe work practices.
AS/NZS 4361.2:2017 Guide to hazardous paint management — Part 2: Lead paint in residential, public and commercial buildings
Covers how to find out whether lead paint is present and how to choose a way to manage it.

Frequently asked questions

It depends on the work. Some minor work is exempt development, some can be approved with a complying development certificate, and some needs a development application. Your council or a registered certifier can confirm which applies before work starts.

Homes built or renovated before 1990 could contain asbestos, and homes built before 1970 are likely to have lead paint. Suspect materials should be tested before anything is cut, sanded or removed.

Often you can for part of the job, but it depends on which rooms are being worked on and on dust, noise and access to water and power. We talk this through at the site visit so you can plan around it.

Planning a renovation?

Tell us what you have in mind and we’ll arrange a site visit and a written quote.

Get a Quote