Rendering (Solid Plastering)

Cement and acrylic rendering for brick and block walls, inside and out. Render can refresh tired brickwork, hide repairs and give a smooth or textured finish ready for paint.

What's included

  • Cleaning and preparation of walls
  • Repairs to cracks and damaged masonry before rendering
  • Cement or acrylic render, smooth or textured
  • Corner beads and set-out around windows and doors
  • Sealing and painting after the render has cured

How the job runs

  1. Site visit

    We look at the job with you, talk through what you want, and take measurements. We also note the condition of the wall, existing coatings, and access, including whether scaffolding is needed.

  2. Written quote

    You receive a written quote that sets out the scope of work, what is and isn’t included, and any allowances for items you are still choosing.

  3. Finish selection

    You choose the render type, texture and paint colour.

  4. The work

    Preparation and repairs, render coats, curing, then sealing and painting.

  5. Final walkthrough

    We go through the finished work with you and note anything that needs attention.

Standards & regulations

Relevant rules for rendering work include:

Asbestos in older homes
SafeWork NSW advises that any house built or renovated before 1990 could contain asbestos, for example in roofing, eaves, fencing and flooring underlay. Suspect materials should be tested before work starts, and SafeWork NSW recommends using a licensed asbestos removalist.
Cleaning asbestos surfaces
SafeWork NSW warns never to use high-pressure water, a trigger hose or compressed air on asbestos roofing or other asbestos products such as fences, eaves, gutters and downpipes.
Lead paint and dust
NSW Government guidance says lead paint was used in most homes built in Australia before 1970, and that lead dust can build up in roof spaces, behind walls and under floorboards. Old paint and dust should be handled with lead-safe work practices.
Working at heights
Under NSW work health and safety rules, fall risks must be managed at any height, and construction work where a person could fall more than 2 metres needs a safe work method statement. SafeWork NSW prefers working from the ground or using fall-prevention devices such as scaffolds and guardrails.

Frequently asked questions

Sometimes, but the paint has to be sound and the surface prepared properly. In homes built before 1970, old paint may contain lead and should be tested before it is sanded or scraped.

Fibro in homes built or renovated before 1990 may contain asbestos. It should be tested before any work, and should never be pressure-cleaned or sanded.

Often, yes, for upper-storey walls. Where someone could fall more than 2 metres, the work needs a safe work method statement, and the fall risk has to be controlled, for example with scaffolding.

Planning a render?

Tell us what you have in mind and we’ll arrange a site visit and a written quote.

Get a Quote