Timber Flooring

Timber flooring installed over new or existing subfloors, plus repairs to existing boards. A timber floor needs a sound, level base, so the subfloor is checked before any new boards go down.

What's included

  • Removal of old floor coverings
  • Subfloor checks, repairs and levelling
  • Installation of solid timber and engineered boards
  • Repairs and replacement of damaged boards
  • Trims, thresholds and skirtings

How the job runs

  1. Site visit

    We look at the job with you, talk through what you want, and take measurements. We also note the condition of the subfloor, moisture, and what is under the existing floor covering.

  2. Written quote

    You receive a written quote that sets out the scope of work, what is and isn’t included, and any allowances for items you are still choosing.

  3. Product selection

    You choose the timber species, board type and finish.

  4. The work

    Removal and preparation, subfloor repairs, installation, then trims and finishing.

  5. Final walkthrough

    We go through the finished work with you and note anything that needs attention.

Standards & regulations

Relevant standards and rules for timber flooring include:

AS 1684.2:2021 Residential timber-framed construction — Part 2: Non-cyclonic areas
Covers the selection, placement and fixing of structural timber in houses and outbuildings, including alterations and additions. It includes floor framing, flooring and decking.
Asbestos in older homes
SafeWork NSW advises that any house built or renovated before 1990 could contain asbestos, for example in roofing, eaves, fencing and flooring underlay. Suspect materials should be tested before work starts, and SafeWork NSW recommends using a licensed asbestos removalist.
Lead paint and dust
NSW Government guidance says lead paint was used in most homes built in Australia before 1970, and that lead dust can build up in roof spaces, behind walls and under floorboards. Old paint and dust should be handled with lead-safe work practices.

Frequently asked questions

Sometimes, if the existing floor is sound, flat and dry. Otherwise it is removed or repaired first. We check this at the site visit.

In homes built or renovated before 1990, flooring underlay can contain asbestos. In homes built before 1970, lead dust can build up under floorboards. Both should be checked before floors are lifted.

Yes. Damaged boards can often be replaced, though new boards may look different from older ones until the floor is sanded and finished.

Planning new floors?

Tell us what you have in mind and we’ll arrange a site visit and a written quote.

Get a Quote