Wall & Floor Tiling

Wall and floor tiling for bathrooms, kitchens, laundries, living areas and outdoor spaces. A tiled surface is only as good as what is underneath it, so preparation, falls and waterproofing come first.

What's included

  • Removal of old tiles and floor coverings
  • Surface preparation and levelling
  • Waterproofing of wet areas and external areas before tiling
  • Wall and floor tiling, including splashbacks and feature walls
  • Outdoor tiling for balconies, patios and paths
  • Grouting, sealing and movement joints

How the job runs

  1. Site visit

    We look at the job with you, talk through what you want, and take measurements. We also note the condition of the floor and walls, falls to drains, and what is underneath the existing finish.

  2. Written quote

    You receive a written quote that sets out the scope of work, what is and isn’t included, and any allowances for items you are still choosing.

  3. Tile selection

    You confirm tiles, layout and grout colour. For wet or outdoor areas, tile slip resistance should be part of the choice.

  4. The work

    Removal and preparation, waterproofing where needed (left to cure before tiling), tiling, then grouting and sealing.

  5. Final walkthrough

    We go through the finished work with you and note anything that needs attention.

Standards & regulations

Tiling work in NSW should meet the National Construction Code (NCC). Relevant standards include:

AS 3958:2023 Installation of ceramic and stone tiles
Covers the preparation, fixing and grouting of ceramic and stone wall and floor tiles.
AS 3740:2021 Waterproofing of domestic wet areas
Covers waterproofing of indoor wet areas such as bathrooms, showers and laundries.
AS 4654.2-2012 Waterproofing membranes for external above-ground use — Part 2: Design and installation
Covers waterproofing membranes for balconies, decks, roofs and planter boxes.
AS 4586-2013 Slip resistance classification of new pedestrian surface materials
Sets out how the slip resistance of new floor surfaces is tested and classified.
Asbestos in older homes
SafeWork NSW advises that any house built or renovated before 1990 could contain asbestos, for example in roofing, eaves, fencing and flooring underlay. Suspect materials should be tested before work starts, and SafeWork NSW recommends using a licensed asbestos removalist.

Frequently asked questions

Sometimes, but only if the existing tiles are firmly bonded, flat and suitable, and the extra height works with doors and fixtures. We check this at the site visit.

Tiled balconies and other external areas are usually waterproofed with a membrane under the tiles. AS 4654.2 covers how these membranes are designed and installed.

In homes built or renovated before 1990, old flooring underlay can contain asbestos. It should be tested before it is lifted.

Planning a tiling job?

Tell us what you have in mind and we’ll arrange a site visit and a written quote.

Get a Quote